Ordinance on Large Combustion Plants, Gas Turbine Plants and Internal Combustion Engine Plants In force Unlisted

Overview

Jurisdiction
Germany
Topic
-
Instrument type
Regulation
Reference number
bimschv_13_2021
Valid from
2021-07-15
Valid to
2000-01-01
Modified date
2021-07-15
Listed at
Unlisted draft
Withdrawn at
-
Description
Regulates the construction, design, operation, monitoring and emission limits of combustion plants with a rated thermal input of at least 50 MW, including large combustion plants, gas turbines and internal combustion engine plants.

Ask Question

Sources

Source URL Crawler Publish date
https://www.gesetze-im-internet.de/bimschv_13_2021/xml.zip German Federal Law

Logs

Type Status Started at Finished at
No jobs yet.

Rule sets

Label Effective
Combustion plants of at least 50 MW 2021-08-18 — 9999-12-31
Applies from milestone:
Application Start (2021-08-18)
Expires at milestone:
-
Conditions:
  • Products contains No Linked Attribute Value “Feuerungsanlagen” “Gasturbinenanlagen” “Verbrennungsmotoranlagen”
General large combustion plants 2021-08-18 — 9999-12-31
Applies from milestone:
Application Start (2021-08-18)
Expires at milestone:
-
Conditions:
  • Activities contains No Linked Attribute Value “Großfeuerungsanlage außerhalb Zellstoffindustrie, Raffinerie, organische Grundchemikalien oder chemische Reaktoren”
Pulp-industry combustion plants 9999-01-01 — 9999-12-31
Conditions:
  • Activities contains No Linked Attribute Value “Zellstoffindustrie”
  • Products contains No Linked Attribute Value “faserige pflanzliche Abfälle” “Ablaugen aus der Zellstoffherstellung”
Refinery combustion plants 9999-01-01 — 9999-12-31
Conditions:
  • Activities = No Linked Attribute Value “Raffinerie”
  • Products contains No Linked Attribute Value “Raffinerieheizgase” “Destillationsrückstände” “Konversionsrückstände”
Basic organic chemicals combustion plants 2021-12-08 — 9999-12-31
Applies from milestone:
Application Start (2021-12-08)
Expires at milestone:
-
Conditions:
  • Activities contains No Linked Attribute Value “Herstellung von Alkenen durch Spalten von Kohlenwasserstoffen” “Spalten von 1,2-Dichlorethan”
Chemical industry – indirect reactor heating 9999-01-01 — 9999-12-31
Conditions:
  • Activities contains No Linked Attribute Value “Reformieren von Erdgas” “mittelbare Beheizung von Gütern in chemischen Reaktoren”
  • Products not in No Linked Attribute Value “Feuerungsanlagen im Anwendungsbereich des Abschnitts 5”

Questions this regulation asks

Attributes only this regulation asks about — criteria no general attribute expresses. A company answers each once.

This regulation asks no questions of its own — every condition uses a general attribute.

Obligations

Title Kind Rule set
Comply with emission limits Other -
Description:
The operator must properly construct and operate the combustion plant and comply with the applicable emission limits. After a substantial change, the requirements apply to the changed or affected plant parts; the total capacity after the change is decisive.
Frequency:
Continuous
Check frequency:
Continuous
Products/Services:
Combustion plants with a rated thermal input of at least 50 MW, including large combustion plants, gas turbine plants and combustion engine plants
Checking responsibility:
Operator; oversight by the competent authority
Check method:
Compliance with the applicable emission limits using annual, monthly, daily and half-hourly averages and, where applicable, sulphur removal and flue-gas desulphurisation rates
Rule set:
-
Source reference:
§ 28 Abs. 1; § 8
Source excerpt:
Feuerungsanlagen sind so zu errichten und zu betreiben, dass die Anforderungen dieses Absatzes und der Absätze 2 bis 5, des Absatzes 6 Satz 1, des Absatzes 7, des Absatzes 8 Satz 1 und 3, des Absatzes 9 Satz 1 und der Absätze 10 bis 15 eingehalten werden.
Assess and implement combined heat and power Governance -
Description:
During construction or a substantial change, combined heat and power measures must be implemented where technically possible and proportionate. Otherwise, the competent authority must be notified without delay. For certain natural-gas-fired gas turbine or combustion engine plants, gas-and-steam turbine or combustion-engine-and-steam-turbine coupling measures must be implemented instead.
Frequency:
Event-triggered
Check frequency:
Event-triggered
Products/Services:
Combustion plants being constructed or substantially changed
Checking responsibility:
Operator; competent authority as recipient of the notification
Check method:
Assessment of technical feasibility and proportionality; immediate notification to the competent authority if the measure cannot be carried out
Rule set:
-
Source reference:
§ 7 Abs. 1 und 2
Source excerpt:
Der Betreiber hat bei der Errichtung oder der wesentlichen Änderung einer Feuerungsanlage Maßnahmen zur Kraft-Wärme-Kopplung durchzuführen, es sei denn, dies ist technisch nicht möglich oder unverhältnismäßig.
Assess carbon dioxide retrofit Due Diligence -
Description:
Before the first permit and for a corresponding change or expansion, the operator must assess whether suitable carbon dioxide storage and transport facilities are available and whether retrofit for capture and compression is technically feasible and economically reasonable. If the conditions are met, sufficient space for the retrofit must be reserved.
Frequency:
Event-triggered
Check frequency:
One-time
Products/Services:
Combustion plants for electricity generation with a rated electrical output of at least 300 MW
Checking responsibility:
Operator; review and receipt by the competent authority
Check method:
Assessment of suitable carbon dioxide storage availability and the technical and economic feasibility of transport access and retrofit; submission of the result to the authority
Rule set:
-
Source reference:
§ 9 Abs. 1 und 2
Source excerpt:
Vor der erstmaligen Genehmigung der Errichtung oder des Betriebs einer Feuerungsanlage zur Erzeugung von Strom mit einer elektrischen Nennleistung von 300 MW oder mehr hat der Betreiber zu prüfen, ob
Control emissions during storage and transport Other -
Description:
During storage and transport, the operator must take the emission-control measures specified in more detail by the authority. Dust from filters must be removed into closed containers or moistened at discharge points; dusty combustion residues must be transported and stored temporarily in closed systems.
Frequency:
Continuous
Check frequency:
Continuous
Products/Services:
Substances stored or transported at combustion plants and dusty combustion residues
Checking responsibility:
Operator; details specified by the competent authority
Check method:
Use of emission-control measures, closed containers, enclosed transport systems and enclosed interim storage
Rule set:
-
Source reference:
§ 10
Source excerpt:
Für staubförmige Verbrennungsrückstände sind geschlossene Transporteinrichtungen und geschlossene Zwischenlager zu verwenden.
Perform fuel control Record Keeping -
Description:
The operator must determine data for fuels supplied to the plant, generally quarterly for lignite and annually for other fuels. Longer intervals apply where results are sufficiently stable; a new fuel requires an immediate renewed determination. Results must be retained for five years and submitted on request.
Frequency:
Other
Check frequency:
Other
Products/Services:
Combustion plants receiving fuels
Checking responsibility:
Operator or appointed fuel supplier; competent authority on request
Check method:
Determine fuel data by sampling according to generally accepted technical rules; retain and submit the results
Rule set:
-
Source reference:
§ 13
Source excerpt:
Der Betreiber hat die Brennstoffdaten der der Feuerungsanlage zugeführten Brennstoffe, ausgenommen Zündbrennstoffe, gemäß Anlage 1 zu ermitteln (Brennstoffkontrolle).
Determine energy efficiency Record Keeping -
Description:
The operator must determine electrical or mechanical net efficiency and, where applicable, fuel-based net efficiency after commissioning and after relevant changes. Results must be retained for at least five years and submitted on request.
Frequency:
Event-triggered
Check frequency:
Event-triggered
Products/Services:
Combustion plants generating electrical or mechanical energy or useful heat
Checking responsibility:
Operator or appointed manufacturer or supplier; competent authority on request
Check method:
Determine net efficiency through a performance test at the permitted maximum output or under representative operating conditions
Rule set:
-
Source reference:
§ 14
Source excerpt:
Der Betreiber einer Feuerungsanlage zur Bereitstellung von elektrischer oder mechanischer Energie hat den elektrischen oder mechanischen Nettowirkungsgrad zu bestimmen.
Ensure measurement and monitoring Record Keeping -
Description:
Before commissioning, suitable measurement sites and measurement and evaluation systems must be installed. The operator must continuously or periodically determine the required parameters, have instruments calibrated and tested, and evaluate and document the results.
Frequency:
Continuous
Check frequency:
Continuous
Products/Services:
Combustion plants requiring emission or operating-parameter measurements
Checking responsibility:
Operator; officially designated measurement body for calibration and functional testing; competent authority for evidence and reports
Check method:
Set up suitable measurement sites and instruments; perform continuous or periodic measurement, calibration, functional testing and validation according to the prescribed methods
Rule set:
-
Source reference:
§§ 15 bis 21
Source excerpt:
Der Betreiber hat vor der Inbetriebnahme einer Anlage für die Messungen zur Feststellung der Emissionen sowie zur Ermittlung der Bezugs- oder Betriebsgrößen Messplätze einzurichten.
Submit measurement and emission reports Reporting -
Description:
The operator must submit continuous measurement reports annually by 31 March of the following year, periodic measurement reports within twelve weeks, and annual emission reports by 30 April of the following year. Reports and related records generally must be retained for five years.
Frequency:
Annual
Check frequency:
Annual
Products/Services:
Combustion plants subject to continuous or periodic measurement obligations
Checking responsibility:
Operator; competent authority as recipient
Check method:
Prepare measurement reports, annual reports and, where applicable, evidence; submit them to the competent authority and retain the documents
Rule set:
-
Source reference:
§ 22 Abs. 1; §§ 19 Abs. 4, 21 Abs. 1
Source excerpt:
Der Betreiber hat der zuständigen Behörde jährlich jeweils bis zum Ablauf des 30. April des Folgejahres für jede einzelne Anlage unter Beachtung der Aggregationsregeln nach § 4 Folgendes zu berichten:
Retrofit grid stability plants Governance -
Description:
The operator must determine expected operating hours, enable any required retrofit, and carry it out if the rolling five-year average exceeds 300 hours. The retrofit must be completed within two years, and operating hours must be reported annually.
Frequency:
Event-triggered
Check frequency:
Event-triggered
Products/Services:
Grid stability plants expected to operate for more than 300 hours per year
Checking responsibility:
Operator; competent authority receiving the annual report
Check method:
Determine operating hours over the rolling five-year average and carry out the technical retrofit within the statutory period
Rule set:
-
Source reference:
§ 35 Abs. 1 bis 4
Source excerpt:
Der Betreiber hat gemäß Absatz 3 die Nachrüstung nach Absatz 1 Satz 2 durchzuführen, wenn die jährlichen Betriebsstunden der Netzstabilitätsanlage im gleitenden Durchschnitt über einen Zeitraum von fünf Jahren einen Wert von 300 Stunden übersteigen.
Handle air-pollution-control failures Other -
Description:
In the event of malfunction or failure of air-pollution control, the operator must immediately restore proper operation. If this cannot be achieved within 24 hours, operation must be restricted or the plant shut down; the authority must be notified within 48 hours at the latest.
Frequency:
Event-triggered
Check frequency:
Event-triggered
Products/Services:
Combustion plants experiencing malfunction or failure of an air-pollution control device
Checking responsibility:
Operator; competent authority receiving the notification
Check method:
Take immediate restoration measures; restrict or shut down operation after 24 hours at the latest; notify the authority within 48 hours at the latest
Rule set:
-
Source reference:
§ 12 Abs. 2
Source excerpt:
Der Betreiber einer Anlage hat bei einer Betriebsstörung an einer Abgasreinigungseinrichtung oder bei ihrem Ausfall unverzüglich die erforderlichen Maßnahmen für die Wiederherstellung eines ordnungsgemäßen Betriebs zu ergreifen.

Measures

No measures.

Penalties

Description Kind Rule set
Intentional or negligent breaches of construction and operating requirements, notification, evidence, measurement, monitoring, reporting, record-retention and retrofit duties constitute administrative offences under Section 62(1) no. 2 or no. 7 of the Federal Immission Control Act. The regulation itself does not specify a monetary amount. Other -
Responsible authority:
Zuständige Verwaltungsbehörde nach dem Bundes-Immissionsschutzgesetz
Source reference:
§ 67 Abs. 1 und 2
Source excerpt:
Ordnungswidrig im Sinne des § 62 Absatz 1 Nummer 2 des Bundes-Immissionsschutzes handelt, wer vorsätzlich oder fahrlässig

Milestones

Date Type Description
2021-08-18 Application Start Application begins for existing plants within the scope of Section 2.
Source reference:
§ 39 Abs. 1
Source excerpt:
Für bestehende Anlagen im Anwendungsbereich des Abschnitts 2 gelten die Anforderungen dieser Verordnung ab dem 18. August 2021.
2021-12-08 Application Start Application begins for existing plants within the scope of Section 5.
Source reference:
§ 61 Abs. 2
Source excerpt:
Für bestehende Anlagen im Anwendungsbereich des Abschnitts 5 gelten die Anforderungen dieser Verordnung, ausgenommen die unter Absatz 1 fallenden Anforderungen, ab dem 8. Dezember 2021.
2022-01-01 Application Start Application begins for annual emission limits for existing plants under Section 2.
Source reference:
§ 39 Abs. 1
Source excerpt:
Abweichend von Satz 1 gelten die jahresbezogenen Emissionsgrenzwerte ab dem Kalenderjahr 2022.
2023-01-01 Application Start Application begins for the regulatory requirements for certain 2003 existing plants supplying district heating.
Source reference:
§ 39 Abs. 2
Source excerpt:
Abweichend von Absatz 1 gelten für 2003-Altanlagen im Anwendungsbereich des Abschnitts 2 mit einer Feuerungswärmeleistung von 50 MW bis 200 MW, die mindestens 50 Prozent der erzeugten Nutzwärme der Anlage, berechnet als gleitender Durchschnitt über einen Zeitraum von fünf Jahren, als Dampf oder Warmwasser in ein öffentliches Fernwärmenetz abgeben, die Anforderungen dieser Verordnung ab dem 1. Januar 2023.
2023-12-31 Other Deadline for shutting down certain existing plants under the transitional provision.
Source reference:
§ 39 Abs. 3
Source excerpt:
dass er diese Anlage unter Verzicht auf die Berechtigung zum Betrieb aus der Genehmigung bis zum Ablauf des 31. Dezember 2023 stilllegt
2024-07-15 Other End of the transitional methane emission limit for lean-burn operation.
Source reference:
§ 34 Abs. 2
Source excerpt:
Bis zum Beginn des 15. Juli 2024 gilt abweichend von Absatz 1 Satz 2 Nummer 2 Buchstabe c Doppelbuchstabe aa ein Emissionsgrenzwert für Methan von 1 050 mg/m³ für den Tagesmittelwert.
2025-07-15 Application Start Stricter mercury limits begin for certain existing large combustion plants.
Source reference:
§ 28 Abs. 3 und 4
Source excerpt:
und ab dem 15. Juli 2025