|
|
2023-10-18 |
Adopted |
Directive adopted |
|
|
- Source reference:
- Article 7
- Source excerpt:
- Done at Strasbourg, 18 October 2023.
|
|
|
2023-11-20 |
Entry into Force |
Directive enters into force |
|
|
- Source reference:
- Article 7
- Source excerpt:
- This Directive shall enter into force on the twentieth day following that of its publication in the Official Journal of the European Union.
|
|
|
2024-01-01 |
Repeal |
Repeal of Directive (EU) 2015/652 |
|
|
- Source reference:
- Article 6
- Source excerpt:
- Council Directive (EU) 2015/652 is repealed with effect from 1 January 2025.
|
|
|
2024-02-21 |
Application Start |
Deadline for the presumption of overriding public interest |
|
|
- Source reference:
- Article 16f
- Source excerpt:
- By 21 February 2024, until climate neutrality is achieved, Member States shall ensure that, in the permit-granting procedure, the planning, construction and operation of renewable energy plants, the connection of such plants to the grid, the related grid itself, and storage assets are presumed as being in the overriding public interest
|
|
|
2024-05-21 |
Application Start |
Deadline for optionally declaring existing areas as renewables acceleration areas |
|
|
- Source reference:
- Article 15c(4)
- Source excerpt:
- By 21 May 2024, Member States may declare as renewables acceleration areas specific areas which have already been designated to be areas suitable for an accelerated deployment of one or more types of renewable energy technology
|
|
|
2024-07-01 |
Transposition Deadline |
Deadline for transposing provisions on infrastructure areas and permitting |
|
|
- Source reference:
- Article 5(1)
- Source excerpt:
- Member States shall bring into force the laws, regulations and administrative provisions necessary to comply with Article 1, point (6), with regard to Article 15e of Directive (EU) 2018/2001, and Article 1, point (7), with regard to Articles 16, 16b,16c, 16d, 16e and 16f of that Directive, by 1 July 2024.
|
|
|
2024-11-21 |
Application Start |
Union database for renewable and recycled carbon fuels to be established |
|
|
- Source reference:
- Article 31a(1)
- Source excerpt:
- By 21 November 2024, the Commission shall ensure that a Union database is set up to enable the tracing of liquid and gaseous renewable fuels and recycled carbon fuels
|
|
|
2025-01-01 |
Repeal |
Effective date of the repeal of Directive (EU) 2015/652 |
|
|
- Source reference:
- Article 6
- Source excerpt:
- Council Directive (EU) 2015/652 is repealed with effect from 1 January 2025.
|
|
|
2025-05-21 |
Application Start |
Deadline for coordinated mapping of areas for renewable energy deployment |
|
|
- Source reference:
- Article 15b(1)
- Source excerpt:
- By 21 May 2025, Member States shall carry out a coordinated mapping for the deployment of renewable energy in their territory
|
|
|
2025-05-21 |
Application Start |
Deadline for annual publication of residual energy mix data |
|
|
- Source reference:
- Article 19(4)
- Source excerpt:
- by 21 May 2025, Member States shall ensure that the data on their residual energy mix are published on an annual basis.
|
|
|
2025-05-21 |
Transposition Deadline |
General transposition deadline |
|
|
- Source reference:
- Article 5(1)
- Source excerpt:
- Member States shall bring into force the laws, regulations and administrative provisions necessary to comply with this Directive by 21 May 2025.
|
|
|
2025-11-21 |
Application Start |
Deadline for fully electronic permitting procedures |
|
|
- Source reference:
- Article 16(3)
- Source excerpt:
- By 21 November 2025 Member States shall ensure that all permit-granting procedures are carried out in electronic form.
|
|
|
2026-02-21 |
Application Start |
Deadline for designating renewables acceleration areas |
|
|
- Source reference:
- Article 15c(1)
- Source excerpt:
- By 21 February 2026, Member States shall ensure that competent authorities adopt one or more plans designating, as a sub-set of the areas referred to in Article 15b(1), renewables acceleration areas for one or more types of renewable energy sources.
|
|
|
2027-12-31 |
Other |
Deadline for the Commission report on biomass support schemes |
|
|
- Source reference:
- Article 3(3d)
- Source excerpt:
- By 2027, the Commission shall publish a report on the impact of the Member States’ support schemes for biomass
|
|
|
2028-07-01 |
Other |
Deadline for assessing the methodology for renewable fuels of non-biological origin |
|
|
- Source reference:
- Article 27(6)
- Source excerpt:
- By 1 July 2028, the Commission shall submit a report to the European Parliament and the Council assessing the impact of the Union methodology
|
|
|
2030-01-01 |
Application Start |
Start of increased sustainability requirement for certain biomass installations |
|
|
- Source reference:
- Article 29(10)(e)
- Source excerpt:
- at least 80 % from 1 January 2030
|
|
|
2030-12-31 |
Application Start |
Target year for renewable energy and transport targets |
|
|
- Source reference:
- Article 25(1)
- Source excerpt:
- the amount of renewable fuels and renewable electricity supplied to the transport sector leads to a: (i) share of renewable energy within the final consumption of energy in the transport sector of at least 29 % by 2030
|
|
|
2033-12-31 |
Other |
Deadline for a third joint project for high electricity-consuming Member States |
|
|
- Source reference:
- Article 9(1a)(b)
- Source excerpt:
- by 31 December 2033, Member States with an annual electricity consumption of more than 100 TWh shall endeavour to agree on establishing a third joint project.
|