Emtract Ingest

First Offshore Wind Energy Regulation In force Unlisted

Overview

Jurisdiction
Germany
Topic
-
Instrument type
Regulation
Reference number
windseev_1
Valid from
2020-12-04
Valid to
2026-08-05
Modified date
2020-12-03
Listed at
Unlisted draft
Withdrawn at
-
Description
Regulation establishing the suitability of certain offshore wind energy areas in Germany’s exclusive economic zone, setting requirements for their subsequent development, and determining the capacity to be installed.

Ask Question

Sources

Source URL Crawler Publish date
https://www.gesetze-im-internet.de/windseev_1/xml.zip German Federal Law

Logs

Type Status Started at Finished at
No jobs yet.

Rule sets

Label Effective
Area N-3.7 2021-01-01 — 9999-12-31
Country scope:
DE

No conditions.

Area N-3.8 2021-01-01 — 9999-12-31
Country scope:
DE

No conditions.

Area O-1.3 2021-01-01 — 9999-12-31
Country scope:
DE

No conditions.

Questions this regulation asks

Attributes only this regulation asks about — criteria no general attribute expresses. A company answers each once.

This regulation asks no questions of its own — every condition uses a general attribute.

Obligations

Title Kind Rule set
Monitoring of environmental impacts Reporting -
Description:
Conduct monitoring of construction- and operation-related impacts during the construction phase and for at least the first three years of operation.
Frequency:
Continuous
Check frequency:
Continuous
Products/Services:
Offshore wind turbines and associated facilities on areas N-3.7, N-3.8 and O-1.3
Checking responsibility:
-
Check method:
-
Rule set:
-
Source reference:
§ 4 Abs. 1
Source excerpt:
Der Träger des Vorhabens hat während der Bauphase und mindestens während der drei ersten Jahre des Betriebes der Anlagen ein Monitoring zu den bau- und betriebsbedingten Auswirkungen der Anlagen ... durchzuführen.
Updating the baseline survey Other -
Description:
Update or completely repeat the baseline survey before construction, depending on the period between its completion and the start of construction.
Frequency:
Event-triggered
Check frequency:
Event-triggered
Products/Services:
Marine-environment investigations and baseline survey
Checking responsibility:
-
Check method:
-
Rule set:
-
Source reference:
§ 4 Abs. 2
Source excerpt:
Als Grundlage für das Monitoring ist das Ergebnis der Basisaufnahme auf der Grundlage der Ergebnisse eines vor Baubeginn durchzuführenden dritten Untersuchungsjahres zu aktualisieren, wenn zwischen dem Ende der Basisaufnahme und dem Baubeginn nicht mehr als fünf Jahre liegen. Liegen zwischen dem Ende der Basisaufnahme und dem Baubeginn mehr als fünf Jahre, so ist die Basisaufnahme vor Baubeginn vollständig zu wiederholen.
Environmentally sound cable laying Governance -
Description:
Observe the spatial-development-plan principle on sediment heating when sizing and laying internal cable systems and select a method causing the least possible environmental impact.
Frequency:
Event-triggered
Check frequency:
Event-triggered
Products/Services:
Internal offshore wind-farm cable systems
Checking responsibility:
-
Check method:
-
Rule set:
-
Source reference:
§ 5 Abs. 1
Source excerpt:
Der Träger des Vorhabens hat bei der Dimensionierung und Verlegung der parkinternen Seekabelsysteme den Planungsgrundsatz des Flächenentwicklungsplans zur Sedimenterwärmung zu beachten.
Emission prevention and reduction Due Diligence -
Description:
Avoid emissions or reduce them where unavoidable; use environmentally compatible operating substances and secure and monitor technical installations against pollutant accidents and environmental releases.
Frequency:
Continuous
Check frequency:
Continuous
Products/Services:
Facilities and their operation
Checking responsibility:
-
Check method:
-
Rule set:
-
Source reference:
§ 6 Abs. 1
Source excerpt:
Der Träger des Vorhabens hat Emissionen zu vermeiden oder, soweit sie unvermeidlich sind, zu vermindern.
Low-noise foundation and installation Due Diligence -
Description:
Use the quietest state-of-the-art work method for foundation and installation, select a structure with minimal operational noise, minimise piling and deterrence duration, and refrain from blasting.
Frequency:
Event-triggered
Check frequency:
Event-triggered
Products/Services:
Facilities involving piling and operational noise
Checking responsibility:
-
Check method:
-
Rule set:
-
Source reference:
§ 7 Abs. 1
Source excerpt:
Bei der Gründung und Installation einer Anlage hat der Träger des Vorhabens diejenige Arbeitsmethode nach dem Stand der Technik anzuwenden, die nach den vorgefundenen Umständen so geräuscharm wie möglich ist.
Compliance with acoustic limits Other -
Description:
Comply with the acoustic limits, minimise the duration of piling including deterrence, and refrain from blasting.
Frequency:
Event-triggered
Check frequency:
Continuous
Products/Services:
Facilities and foundation structures
Checking responsibility:
-
Check method:
-
Rule set:
-
Source reference:
§ 7 Abs. 2
Source excerpt:
Die durch Rammarbeiten verursachten Schallemissionen dürfen für den Schalldruck den Wert von 160 Dezibel und für den Spitzenschalldruckpegel den Wert von 190 Dezibel ... in einer Entfernung von 750 Metern nicht überschreiten.
Low-pollutant corrosion protection Due Diligence -
Description:
Use low-pollutant corrosion protection and an oil-repellent coating in the splash zone; do not use zinc anodes or biocides.
Frequency:
Continuous
Check frequency:
Continuous
Products/Services:
Facilities and offshore platforms
Checking responsibility:
-
Check method:
-
Rule set:
-
Source reference:
§ 9 Abs. 1
Source excerpt:
Der vom Träger des Vorhabens eingesetzte Korrosionsschutz der Anlage muss möglichst schadstofffrei und emissionsarm sein.
Collection and disposal of wastewater Other -
Description:
Collect wastewater properly, transport it ashore and dispose of it under applicable waste law; do not use unauthorised wastewater-treatment plants or chlorination.
Frequency:
Continuous
Check frequency:
Continuous
Products/Services:
Wastewater from offshore platforms
Checking responsibility:
-
Check method:
-
Rule set:
-
Source reference:
§ 11 Abs. 1
Source excerpt:
Der Träger des Vorhabens hat das Abwasser aus sanitären Einrichtungen, Sanitätseinrichtungen, Küchen und Wäschereien vorbehaltlich des Absatzes 3 fachgerecht zu sammeln, an Land zu verbringen und dort nach den geltenden abfallrechtlichen Bestimmungen zu entsorgen.
Drainage-water monitoring Governance -
Description:
Continuously monitor the oil content of drainage water using sensors, make readings remotely accessible, and automatically prevent discharge when the limit is exceeded.
Frequency:
Continuous
Check frequency:
Continuous
Products/Services:
Drainage-water systems
Checking responsibility:
-
Check method:
Continuous sensor monitoring with remote readability and automatic valves.
Rule set:
-
Source reference:
§ 12 Abs. 2
Source excerpt:
Der Träger des Vorhabens hat den Ölgehalt des Drainagewassers im Ablauf durch den Träger des Vorhabens mittels Sensoren kontinuierlich zu überwachen. Die mit den Sensoren gemessenen aktuellen Werte müssen durch den Träger des Vorhabens aus der Ferne auslesbar sein.
Diesel-generator emission requirements Due Diligence -
Description:
Certify diesel generators under MARPOL Annex VI Tier III or demonstrably equivalent standards, do not install fixed diesel generators on wind turbines, and use low-sulphur fuel where possible.
Frequency:
Continuous
Check frequency:
Continuous
Products/Services:
Offshore platforms and wind turbines
Checking responsibility:
-
Check method:
-
Rule set:
-
Source reference:
§ 13 Abs. 1
Source excerpt:
Auf Offshore-Plattformen eingesetzte Dieselgeneratoren müssen bezüglich der Emissionswerte nach MARPOL Anhang VI Tier III oder nach nachweislich mindestens gleichwertigen Emissionsstandards zertifiziert sein.
Materials for scour and cable protection Due Diligence -
Description:
Limit hard substrate to the minimum required and generally use natural stone or inert and natural materials; use plastic in cable protection only exceptionally and to a minimum.
Frequency:
Event-triggered
Check frequency:
Event-triggered
Products/Services:
Scour and cable-protection measures
Checking responsibility:
-
Check method:
-
Rule set:
-
Source reference:
§ 14 Abs. 1
Source excerpt:
Bei Kolk- und Kabelschutzmaßnahmen hat der Träger des Vorhabens das Einbringen von Hartsubstrat auf das zur Herstellung des Schutzes der jeweiligen Anlage erforderliche Mindestmaß zu begrenzen.
Facility marking Governance -
Description:
Equip facilities in accordance with applicable rules with aids ensuring maritime and aviation safety until removal from the sea area, and coordinate and adapt marking when adjacent wind farms are built.
Frequency:
Continuous
Check frequency:
Continuous
Products/Services:
Offshore wind farm and facilities
Checking responsibility:
-
Check method:
-
Rule set:
-
Source reference:
§ 15 Abs. 1
Source excerpt:
Der Träger des Vorhabens hat die Anlagen bis zu ihrer Entfernung aus dem Seegebiet nach den geltenden Regelwerken der Wasserstraßen- und Schifffahrtsverwaltung des Bundes und nach dem Stand der Technik mit Einrichtungen auszustatten, die die Sicherheit des Schiffs- und Luftverkehrs gewährleisten.
Maritime monitoring and collision prevention Governance -
Description:
Conduct state-of-the-art maritime-space monitoring and take the measures necessary to prevent collisions.
Frequency:
Continuous
Check frequency:
Continuous
Products/Services:
Offshore wind-farm areas
Checking responsibility:
-
Check method:
-
Rule set:
-
Source reference:
§ 16
Source excerpt:
Der Träger des Vorhabens hat eine Seeraumbeobachtung für die Fläche nach dem Stand der Technik durchzuführen und die erforderlichen Maßnahmen zur Vermeidung von Kollisionen zu ergreifen.
Traffic safety during construction Governance -
Description:
Deploy a traffic-safety vessel throughout construction and provisionally mark the facilities and construction area until regular marking is in place, including with cardinal buoys.
Frequency:
Continuous
Check frequency:
Continuous
Products/Services:
Construction sites and facilities during construction
Checking responsibility:
-
Check method:
-
Rule set:
-
Source reference:
§ 18 Abs. 1
Source excerpt:
Zur Sicherung des Umfeldes der Baustelle und zur Vermeidung von Kollisionen mit Schiffen hat der Träger des Vorhabens ab Installationsbeginn oder gegebenenfalls bereits ab Beginn erforderlicher bauvorbereitender Maßnahmen während der gesamten Bauphase ein Verkehrssicherungsfahrzeug im Baustellenumfeld einzusetzen.
Safety standards for vehicles and work equipment Due Diligence -
Description:
Ensure that the marking, conduct, equipment and crew of deployed work equipment and vehicles meet the prescribed safety standards.
Frequency:
Event-triggered
Check frequency:
Event-triggered
Products/Services:
Work equipment and vehicles
Checking responsibility:
-
Check method:
-
Rule set:
-
Source reference:
§ 19 Nr. 2
Source excerpt:
Alle eingesetzten Arbeitsgeräte und Fahrzeuge einschließlich des Verkehrssicherungsfahrzeugs müssen ... in Bezug auf Ausrüstung und Besatzung dem für die Bundesflagge erforderlichen oder einem nachweislich gleichen Sicherheitsstandard genügen.
Provision of flight corridors Governance -
Description:
Provide at least two flight corridors, generally keep them free of structures, and submit an aviation expert's risk assessment where obstacles exist.
Frequency:
Event-triggered
Check frequency:
Continuous
Products/Services:
Offshore platforms and wind turbines
Checking responsibility:
-
Check method:
-
Rule set:
-
Source reference:
§ 22 Abs. 1
Source excerpt:
Der Träger des Vorhabens hat mindestens zwei Flugkorridore, jeweils bestehend aus einem Innenkorridor und zwei ihn flankierenden Außenkorridoren, vorzusehen ...
Marking of aviation obstacles Governance -
Description:
Mark facilities and other obstacles as aviation obstacles under the applicable standard and ensure safe helicopter-deck operation through structural and operational measures.
Frequency:
Continuous
Check frequency:
Continuous
Products/Services:
Facilities and helicopter landing decks
Checking responsibility:
-
Check method:
-
Rule set:
-
Source reference:
§ 24
Source excerpt:
Der Träger des Vorhabens hat die Anlagen als Luftfahrthindernisse sowie sonstige Hindernisse in der Umgebung des Hubschrauberlandedecks entsprechend den Vorgaben des „Standards Offshore-Luftfahrt, Teil 5: Kennzeichnung von Luftfahrthindernissen in der AWZ“ vom 17. August 2020 zu kennzeichnen.
Notification of underwater sensors Reporting -
Description:
Limit the use of specified sensors to what is necessary and notify the German Naval Command at least 20 working days in advance.
Frequency:
Event-triggered
Check frequency:
Event-triggered
Products/Services:
Underwater measuring devices and stationary underwater measuring installations
Checking responsibility:
German Naval Command
Check method:
-
Rule set:
-
Source reference:
§ 25 Abs. 2
Source excerpt:
Der Einsatz von akustischen, optischen, optronischen, magnetsensorischen, elektrischen, elektronischen, elektromagnetischen oder seismischen Sensoren in Messgeräten an unbemannten Unterwasserfahrzeugen oder an stationären Unterwasser-Messeinrichtungen ist auf das erforderliche Maß zu beschränken und rechtzeitig, mindestens jedoch 20 Werktage im Voraus, dem Marinekommando anzuzeigen.
Occupational safety and health Governance -
Description:
Ensure that German occupational safety and health regulations can be complied with.
Frequency:
Continuous
Check frequency:
Continuous
Products/Services:
All facilities and their planning, construction, operation and decommissioning
Checking responsibility:
-
Check method:
-
Rule set:
-
Source reference:
§ 26
Source excerpt:
Bei Planung, Errichtung, Betrieb und Rückbau jeder Anlage hat der Träger des Vorhabens sicherzustellen, dass die deutschen Vorschriften zur Sicherheit und zum Gesundheitschutz bei der Arbeit eingehalten werden können.
Escape and rescue routes Governance -
Description:
Provide at least two suitable escape and rescue access routes, preferably using different transport systems.
Frequency:
Event-triggered
Check frequency:
Event-triggered
Products/Services:
Offshore platforms
Checking responsibility:
-
Check method:
-
Rule set:
-
Source reference:
§ 27 Abs. 3
Source excerpt:
Für eine Offshore-Plattform sind mindestens zwei für den Zweck der Flucht und Rettung geeignete Zu- und Abgangsmöglichkeiten vorzusehen, die unterschiedliche Verkehrssysteme nutzen sollen.
Protection against unexploded ordnance Due Diligence -
Description:
Before works involving ground intervention, identify risks from unexploded ordnance and take necessary occupational-safety measures.
Frequency:
Event-triggered
Check frequency:
Event-triggered
Products/Services:
Works involving ground intervention
Checking responsibility:
-
Check method:
-
Rule set:
-
Source reference:
§ 28
Source excerpt:
Vor der Ausführung von Arbeiten, die einen Eingriff in den Baugrund erfordern, hat der Träger des Vorhabens sicherzustellen, dass mögliche Gefährdungen von Beschäftigten durch Fundmunition ermittelt werden und gegebenenfalls notwendige Maßnahmen des Arbeitsschutzes ergriffen werden.
Support for occupational-safety inspections Reporting -
Description:
Provide information and required documents to the competent authority and transport or fund transport for its inspection agents to the offshore facilities.
Frequency:
Event-triggered
Check frequency:
Event-triggered
Products/Services:
Occupational-safety-related premises, facilities and installations
Checking responsibility:
Competent authority and its agents
Check method:
-
Rule set:
-
Source reference:
§ 29
Source excerpt:
Zur Überwachung der Pflichten aus den §§ 26 bis 28 hat der Träger des Vorhabens der zuständigen Behörde und ihren Beauftragten die für die Überwachung erforderlichen Auskünfte zu erteilen und die erforderlichen Unterlagen einzureichen.
Protection zones for third-party cables and pipelines Due Diligence -
Description:
Protect the safety of third-party cables, pipelines and facilities when working nearby and generally avoid seabed impacts within the 500-metre protection zone unless agreed with the owner.
Frequency:
Event-triggered
Check frequency:
Event-triggered
Products/Services:
Projects and facilities on the areas
Checking responsibility:
-
Check method:
-
Rule set:
-
Source reference:
§ 31 Abs. 2
Source excerpt:
In einem Schutzbereich von 500 Metern beidseits von Seekabeln oder Rohrleitungen Dritter dürfen grundsätzlich keinerlei Einwirkungen auf den Meeresboden vorgenommen werden. Von Satz 1 Abweichendes ist mit dem Eigentümer des Seekabels oder der Rohrleitung zu vereinbaren.
Distances from adjacent wind turbines Governance -
Description:
Maintain the minimum distances from wind turbines on adjacent areas and from the designated transformer-platform site.
Frequency:
Event-triggered
Check frequency:
Event-triggered
Products/Services:
Wind turbines on the areas
Checking responsibility:
-
Check method:
-
Rule set:
-
Source reference:
§ 32
Source excerpt:
Die auf der Fläche zu errichtenden Windenergieanlagen müssen einen Abstand von mindestens dem Fünffachen des jeweils größeren Rotordurchmessers zu Windenergieanlagen benachbarter Flächen einhalten.
Limit on feed-in quantity Governance -
Description:
Do not feed more than the awarded bid quantity into the grid connection point.
Frequency:
Continuous
Check frequency:
Continuous
Products/Services:
Grid connection point and generated electricity
Checking responsibility:
-
Check method:
-
Rule set:
-
Source reference:
§ 33
Source excerpt:
Am Netzanschlusspunkt darf keine höhere als die bezuschlagte Gebotsmenge eingespeist werden.
Technical standards and remote access Governance -
Description:
Carry out planning, construction, operation, decommissioning, design and equipment according to the state of the art or science and technology, and design critical systems to permit monitoring and full access from land.
Frequency:
Continuous
Check frequency:
Continuous
Products/Services:
All facilities and critical systems
Checking responsibility:
-
Check method:
-
Rule set:
-
Source reference:
§ 34 Abs. 1
Source excerpt:
Die Planung, die Errichtung, der Betrieb und der Rückbau sowie die Konstruktion und Ausstattung der Anlagen müssen dem Stand der Technik oder hilfsweise dem Stand von Wissenschaft und Technik entsprechen.
Identification and reporting of existing objects Reporting -
Description:
Before planning and implementation, identify existing objects, take protective measures, promptly document and report discoveries, and consider find locations when selecting sites and routes.
Frequency:
Event-triggered
Check frequency:
Event-triggered
Products/Services:
Cables, pipelines, wrecks, unexploded ordnance, cultural and material assets, and other objects on the areas
Checking responsibility:
Planning approval authority; Maritime Safety and Security Centre Cuxhaven for unexploded-ordnance finds
Check method:
-
Rule set:
-
Source reference:
§ 35 Abs. 1
Source excerpt:
Der Träger des Vorhabens hat vor Beginn der Planung und Realisierung der Anlagen vorhandene Kabel, Leitungen, Wracks, Fundmunition, Kultur- und Sachgüter sowie sonstige Objekte auf der Fläche zu ermitteln und alle daraus gegebenenfalls resultierenden Schutzmaßnahmen zu ergreifen. Das Auffinden von Objekten ist unverzüglich zu dokumentieren und der Planfeststellungsbehörde zu melden.
Survey and submission of constructed facilities Reporting -
Description:
Survey and submit the exact positions of all actually constructed facilities within six months after construction is completed.
Frequency:
One-time
Check frequency:
One-time
Products/Services:
Constructed facilities
Checking responsibility:
Federal Maritime and Hydrographic Agency
Check method:
Survey the exact positions and transmit them to the Federal Maritime and Hydrographic Agency.
Rule set:
-
Source reference:
§ 35 Abs. 2
Source excerpt:
Der Träger des Vorhabens hat die genauen Positionen aller tatsächlich gebauten Anlagen innerhalb von sechs Monaten nach Abschluss der Errichtung einzumessen und an das Bundesamt für Seeschifffahrt und Hydrographie zu übermitteln.
Coordination of piling works Stakeholder Engagement -
Description:
Coordinate the timing of piling works in advance with operators of offshore wind farms being completed in parallel.
Frequency:
Event-triggered
Check frequency:
Event-triggered
Products/Services:
Piling works on areas N-3.7, N-3.8 and O-1.3
Checking responsibility:
-
Check method:
-
Rule set:
-
Source reference:
§ 36 Abs. 1; § 39 Abs. 1; § 42 Abs. 1
Source excerpt:
Der Träger des Vorhabens hat die Durchführung von Rammarbeiten mit den Trägern der Vorhaben parallel fertigzustellender Offshore-Windparks ... vorab zeitlich abzustimmen.
Updated shipping-traffic risk analysis Reporting -
Description:
Submit with the planning documents an expert report reviewing the area-specific quantitative risk analysis using current shipping-traffic figures.
Frequency:
One-time
Check frequency:
One-time
Products/Services:
Projects on areas N-3.7 and N-3.8
Checking responsibility:
Planning approval authority
Check method:
Expert report based on current shipping-traffic figures, submitted with the planning documents.
Rule set:
-
Source reference:
§ 37; § 40; § 44 Abs. 1
Source excerpt:
Der Träger des Vorhabens hat der Planfeststellungsbehörde als Grundlage für die Zulassungsentscheidung mit den Planunterlagen ein Gutachten einzureichen, welches die der Eignungsfeststellung nach dieser Verordnung zugrunde liegende flächenbezogene quantitative Risikoanalyse auf der Grundlage aktueller Zahlen zum Aufkommen des Schiffsverkehrs überprüft.
Migratory-bird risk management Reporting -
Description:
Continuously record migration rates, intensities, vertical distribution, weather conditions and visibility during autumn and spring migration; use suitable real-time devices and submit a data-collection concept with the planning-approval application.
Frequency:
Continuous
Check frequency:
Continuous
Products/Services:
Wind turbines on area O-1.3 and relevant bird species
Checking responsibility:
Planning approval authority receives the concept
Check method:
Suitable data collection, real-time devices and observations of resting sites.
Rule set:
-
Source reference:
§ 43 Abs. 1
Source excerpt:
Der Träger des Vorhabens hat für diejenigen europäischen Vogelarten, die über die Fläche ziehen und für die die Gefahr eines signifikant erhöhten Kollisionsrisikos mit Windenergieanlagen besteht, während des Herbst- und Frühjahrszugs im Rahmen eines Risikomanagements ab der Inbetriebnahme von Windenergieanlagen mindestens die folgenden Daten durchgehend in geeigneter Weise zu erfassen:
Shutdown for elevated bird-collision risk Governance -
Description:
When the collision risk is significantly increased, shut down the wind turbines and turn them out of the wind unless equally suitable mitigation measures are implemented.
Frequency:
Event-triggered
Check frequency:
Event-triggered
Products/Services:
Wind turbines on area O-1.3
Checking responsibility:
-
Check method:
-
Rule set:
-
Source reference:
§ 43 Abs. 4
Source excerpt:
Solange aufgrund der Datenerfassung nach Absatz 1 erkennbar ist, dass das Kollisionsrisiko für die in Absatz 2 und 3 bezeichneten Vogelarten signifikant erhöht ist, sind die Windenergieanlagen abzuschalten und aus dem Wind zu drehen.
Bird-risk mitigation concept Reporting -
Description:
Submit with the planning-approval application a specific concept for data collection and for implementing and evaluating shutdowns or other mitigation measures.
Frequency:
One-time
Check frequency:
One-time
Products/Services:
Projects on area O-1.3
Checking responsibility:
Planning approval authority
Check method:
Submission of a concept to the planning approval authority.
Rule set:
-
Source reference:
§ 43 Abs. 5
Source excerpt:
Der Träger des Vorhabens hat mit dem Antrag auf Planfeststellung ein konkretes Konzept zur Datenerfassung nach Absatz 1 sowie zur Umsetzung und Erfolgskontrolle der Abschaltung oder sonstiger geeigneter Maßnahmen nach Absatz 4 bei der Planfeststellungsbehörde vorzulegen.
Consideration of Swedish firing area Due Diligence -
Description:
Take the Swedish artillery firing area ES-D 140 into account during planning, implementation and operation.
Frequency:
Continuous
Check frequency:
Continuous
Products/Services:
Projects on area O-1.3
Checking responsibility:
-
Check method:
-
Rule set:
-
Source reference:
§ 45
Source excerpt:
Der Träger des Vorhabens hat das über der Fläche liegende schwedische Artillerieschießgebiet ES-D 140 bei der Planung, der Realisierung und dem Betrieb des Vorhabens zu berücksichtigen.

Measures

No measures.

Penalties

No penalties.

Milestones

No milestones.

Linked regulations

No linked regulations.