Railway Crossing Costs Regulation In force Unlisted

Overview

Jurisdiction
Germany
Topic
-
Instrument type
Regulation
Reference number
ekrv_1
Valid from
2021-07-01
Valid to
6040-01-01
Modified date
2021-07-01
Listed at
Unlisted draft
Withdrawn at
-
Description
Regulates the composition and calculation of costs for constructing, modifying and undertaking other measures at railway crossings under the Railway Crossings Act.

Ask Question

Sources

Source URL Crawler Publish date
https://www.gesetze-im-internet.de/ekrv_1/xml.zip German Federal Law

Logs

Type Status Started at Finished at
No jobs yet.

Rule sets

Label Effective
New or Existing Railway Crossings 2021-07-01 — 9999-12-31
Applies from milestone:
Other (2021-07-01)
Expires at milestone:
-
Conditions:
  • Activities contains No Linked Attribute Value “Herstellung einer neuen Kreuzung” “Maßnahmen an bestehenden Kreuzungen”

Questions this regulation asks

Attributes only this regulation asks about — criteria no general attribute expresses. A company answers each once.

This regulation asks no questions of its own — every condition uses a general attribute.

Obligations

Title Kind Rule set
Charging of Own Transport Services Other -
Description:
Transport services provided using the parties' own means of transport must be charged at cost; where railway tariffs exist, those tariffs must be applied.
Frequency:
Event-triggered
Check frequency:
-
Products/Services:
Transport services provided using the parties' own means of transport in connection with railway-crossing measures
Checking responsibility:
-
Check method:
-
Rule set:
-
Source reference:
§ 4 Abs. 4
Source excerpt:
Mit eigenen Transportmitteln erbrachte Beförderungsleistungen sind nach den Selbstkosten abzurechnen. Soweit im Schienenverkehr Tarife bestehen, sind diese anzuwenden.

Measures

No measures.

Penalties

No penalties.

Milestones

Date Type Description
2021-06-30 Other End of validity of the previous version for transitional cases
Source reference:
§ 6
Source excerpt:
Für Maßnahmen, über die die Beteiligten vor dem Ablauf des 1. Juli 2021 eine Vereinbarung getroffen haben, ist diese Verordnung in der bis zum Ablauf des 30. Juni 2021 geltenden Fassung weiterhin anzuwenden.
2021-07-01 Other Cutoff date for agreements covered by the transitional rule
Source reference:
§ 6
Source excerpt:
Für Maßnahmen, über die die Beteiligten vor dem Ablauf des 1. Juli 2021 eine Vereinbarung getroffen haben, ist diese Verordnung in der bis zum Ablauf des 30. Juni 2021 geltenden Fassung weiterhin anzuwenden.

Linked regulations

No linked regulations.